👷♀️ General Contractor
General Contractor
This is a wide-ranging group that could include general contractors of all sorts, including full contract general contractors, carpenters, landscapers, tile setters, painters, flooring specialists, drywall specialists, etc.
👷♀️ General Contractor
Repair Items
- 3.4.1 Envelope and Grounds - Exterior:
EXTERIOR REPAIRS NEEDED
Repairs are needed for the exterior of this building. Examples of observations noted during inspection include:
- A patch was noted in the siding on the north side. This has not been correctly flashed.
- Water seepage at the southeast corner above the stairs
- Seal up the hole in the siding at the south side
- Rotted mounting block on the south side of the building
- Paint failure near the awning on the south side. It almost looks like they missed painting here.
- Mineralization stands noted around the penetrations in the brick at the west side
Recommendation
Hire a qualified contractor to further evaluate and repair the exterior of this building.
- 5.2.1 Decks and Stairs - Decks and Stairs:
REPAIRS ARE NEEDED TO THE STAIR SYSTEM - EASTSIDE
The following observations were noted during the inspection:
- Localized wood decay in the guardrail system on the back side of the second floor balcony
- Localized wood decay in the decking on the south edge of the east deck
Recommendation
Hire a qualified general contractor to further revaluate and repair the guards and railing systems.
- 8.1.1 Main Floor Unit - Main Floor Interior Unit:
REPAIRS ARE NEEDED TO THE DROP CEILING SYSTEM
The following observations were noted:
- Cracked ceiling tiles
- Loose ceiling tiles
- Water stained ceiling tiles
- 8.1.2 Main Floor Unit - Main Floor Interior Unit:
REPAIRS ARE NEEDED TO THE INTERIOR SPACES
The following observations were noted:
- Nail pops noted in the wall finishes above the entry door
Recommendation
Hire a qualified contractor to further evaluate and repair as needed.
- 8.1.8 Main Floor Unit - Main Floor Interior Unit:
REPAIRS ARE NEEDED TO THE WINDOWS
The following observations were noted:
- Damaged window glass at the east side
Recommendation
Hire a qualified contractor to further evaluate and repair as needed.
- 8.1.11 Main Floor Unit - Main Floor Interior Unit:
RESTROOM
The following observations were noted:
- The point of use water heater for the bathroom is not operating. No hot water was noted. Currently there is no hot water for either of the sinks.
- There is no mirror for the bathroom.
- 9.1.3 Second Floor Unit - Second Floor Interior Unit:
REPAIRS ARE NEEDED TO THE WINDOWS
The following observations were noted:
- Lost seal in the south facing window
Recommendation
Hire a qualified contractor to further evaluate and repair as needed.
- 9.1.7 Second Floor Unit - Second Floor Interior Unit:
RESTROOM
The following observations were noted:
- There is no mirror for the second floor bathroom
- A slow drain was noted in the second floor bath sink
Recommended Maintenance Items
- 3.2.1 Envelope and Grounds - Grounds:
PARKING AREA REPAIRS ARE NEEDED
The following observations were noted with the parking area that requires repair:
- Parking lines / markings fading
Recommendation
Repair the parking area for this building as needed.
- 3.2.3 Envelope and Grounds - Grounds:
LANDSCAPING REPAIRS NEEDED
Repairs are needed to the landscaping around the site. The following observations were noted:
- Prune trees and vegetation off the building
Recommendation
Hire a qualified party to repair and complete landscaping projects as needed.
- 5.2.2 Decks and Stairs - Decks and Stairs:
ENTRY STAIR SYSTEM
The entry stair system seems to be performing well. This has plastic decking and there is an access point below it. You could clean the leaves out from underneath here.
- 8.1.4 Main Floor Unit - Main Floor Interior Unit:
THE FLOORING IS GETTING OLDER
Budget for updating in the near term.
- 8.1.5 Main Floor Unit - Main Floor Interior Unit:
REPAIRS ARE NEEDED TO THE DOORS
The following observations were noted:
- The door to the southwest corner office is binding in the door jamb
- The north door is not latching on the west room
- The door to the West room is rubbing on the door jamb
Recommendation
Hire a qualified contractor to further evaluate and repair as needed.
- 9.1.1 Second Floor Unit - Second Floor Interior Unit:
THE FLOORING IS GETTING OLDER
Budget for updating in the near term.
Efficiency Items
- 6.1.2 Attics, Crawl Space, Basements and Structure - Attic Ventilation, Insulation and Framing:
OLDER INSULATION LEVELS
Updating the older attic insulation is recommended for improved energy efficiency.